HONGYANG GROUP Honduras Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Honduras Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

D-G2Q FUEL DISPENSER

D-G2Q

D-G2Q FUEL DISPENSER

FlowMeter Type: Optional

Accuracy : ±0.2%

Pressure Loss (kg/cm): Under 0.25

Motor Voltage(V) :110V/220V/380V,50Hz/60Hz

Capacity(hp): 1HP(0.75kw)

Input Voltage: 110V/220V/380V,50Hz/60Hz

Nozzle: Auto Shut-off Nozzle

Environmental Condition: -40~~+55degree

Control Type: Solenold Vale Control Type

Preset: Function Provided(Small LCDIndicator)

Display(Counter) :Type LCD and Bright Backlight

Digit of Volume : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount :0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price: 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Optional Display: Type LCD and Bright Backlight

Digit of Volume : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price: 0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Totalizer :1~~9,999,999

Hose 4.5m

Weight : 215kg.

Dimension(L×W×H) : 900*620*2180(mm)

Dimension(L×W×H)Of Qty of Container : 40ft: 45 20ft: 22

products links

links

technical archives

    ents on metrological management. The chapter briefly introduces fuel dispenser’s metrological management and technical requirements, appraisal related and attentions. Article I Metrological management and technical requirements In accordance with The Law on Metrology of fuel dispenser’s legal management mainly includes following aspects: Model approval, initial approval, subsequent appraisal and inspection in operation. Model approval refers to an entire test fuel dispenser , examination and assessment as to new model’s entire performance. Initial approval refers to assess whether or not the fuel dispenser made by manufacturer in accordance with the model having been ratification through a series of testing, as well as metrological performance with relative metrological rules and regulations. Initial approval really has two phases fuel dispenser �- approval combined with factory test, and testing appraisal after installation. Subsequent appraisal is conducted after long time since initial appraisal, from which considerable appraisal period is set down according to related requirements. Periodical appraisal is also regarded as the continued subsequent appraisal. Fuel dispenser’s measuring performance within appraisal period needs to be examined, fuel dispenser so filling station should deploy self-check standard instrument (no less than 20L) to examine and inspect. Apart from applied to fuel dispenser approval, JJG443-98 also adapt sample testing and pattern evaluation. Although there are two items of accuracy and flow distance ratio conducted in initial approval and subsequent evaluation, there are other technical parameters different from approval as for fuel dispenser made after passing pattern evaluation, including minimum calculated volume and minimum cubic variable. Several items reference to the pattern evaluation and sampling testing of mechanical hydraulic section of fuel dispenser as followed: Accuracy testing The testing’s purpose is to define the flow curve and verify the tolerance scope in which the allowed maximum tol

technical specification

    s (78 kbits or 1.25 Mbits)   - Power Lines (PLT-20 Cenelec C-Band)   - Optical Fibres   - Short Range Radio   - Infrared Light   - Intrinsically Safe   - Free Form Topology (FTT-10A 78 kbitss)   LonWorks Specific Network Parameters   Addressing:   - the top level of the addressing hierarchy of a LonWorks network is a domain. If   different applications are to fuel dispenser share a communication network they may be separated   into different domains.All forecourt devices are installed in domain 1.   - the second level of addressing is the subnet. A subnet is a logical grouping of nodes   from one or more channels. There may be up to 255 subnets per domain.   - the third level of address fuel dispenser ing is the node. There may be up to 127 nodes per subnet.   - group addressing facilities are not used.   The Lontalk protocol offers four basic message services these being:-   ACKD REQUESTRESPONSE UNACKD_RPT UNACKD   The service implemented on the IFSF network is ACKD. The ACKD service is were   a message is sent to a node and individual acknowled fuel dispenser gements are expected back from   each recipient node. If the acknowledgements are not all received the sender times   out and retries the transaction. The number of retries and the time-out value are   variable and are set along with the network parameters by application level code   (layer 7 OSI model) see below for parameter description and the values set in the IFSF   network implementation:-  February 2006 IFSF - STANDARD FORECOURT PROTOCOL FP2_1.90   COMMUNICATION SPECIFICATION   Page: 9  

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    Cocktail hour FINANCE & ECONOMICS The presidential double Earnings guidance Economics Focus Refugee policy The sound of silence Economics A-Z Less hope, a longer wait SCI fuel dispenser ENCE & TECHNOLOGY The economics of smoking Filtering the evidence The White House reshuffle Technology Quarterly fuel dispenser Snow job Economics focus PEOPLE A host of problems Presidential legacies Dude, where s your library? Obitu fuel dispenser ary Science & Technology New York s Hasidic Jews BOOKS & ARTS In God we tussle Catch if you can Medical marijuana Style Guide Hawaii Reefer madness Sacred or profane? MARKETS & DATA Particle physics Weekly Indicators Lexington